|
Footbox Installation Instructions
You'll have a cutout that looks like this:
Install and drill the new panels in the following order. DO NOT RIVET until all panels are installed as you have to move the inside panel to fit the front panel as shown below. The rivets that hold the panel closest to the engine to the floor panel and the front panel to the floor panel must be riveted from the inside of the foot box.
Inside panel (closest to engine)
Outer panel
The completed footbox will now look like this:
FFMetal.com |
||||||||||||||||||||
|